Industrial

Mounting height changes the answer.

High bay at 28 feet is a different problem from high bay at 16, and the wrong assumption costs you the whole retrofit. OnSiite records the height with the fixture and models the light that actually lands on the floor.

What we look for

What OnSiite expects to find here.

Every property type is configured differently, because they are different. This is the list for yours.

High bays, UFO and linear high bays, strips, wall packs, poles, floods and exit signson record
Rooftop units, panels, transformers and meterson record
Control nodes, where scheduling and dimming already existon record

What it costs you today

Where the money actually goes.

Production does not stop for a lighting survey, and the person who knows the plant is the person you cannot spare. So the plant gets described from memory, and the numbers that come back are wrong in the direction that costs money.

Facility managers in this segment are not inbox people. They take a call, they walk you round, and they decide fast when the answer is specific. The site is here to make that call short.

The question you will ask

“My last quote was built on a walk-through I never saw.”

Every asset carries its own photograph, its nameplate and its mounting height. When a number moves, you can see which fixture moved it. That is what makes a proposal checkable rather than trusted.

The first weeks

What you are holding by the end of it.

One

The inventory

High bays, UFO and linear high bays, strips, wall packs, poles, floods and exit signs — each one located, photographed and typed, in an export that stays yours.

Two

The numbers

What each asset costs you to run, what a replacement costs, and which ones pay for themselves first — priced against live incentive programmes, not from memory.

Three

The order to do it in

A ranked list you can take to whoever signs, with the evidence attached to every line so it survives a question you are not in the room for.

What is behind the numbers

Not a calculator. A run history.

Priced options

429,676

Across 3,442 completed design runs.

Labour samples

13,813

Cost learned from finished jobs, not a price book.

Photometric files

7,154

The light on the ground is modelled, not asserted.

Incentive programmes

357

Applied to your assets, not remembered.

Next step

Walk one property with us.

Pick a building. We map every asset on it, model what each outage actually costs you in light, safety, and money, and hand you the loop: surface, understand, decide, deploy, prove.

Every asset mapped and photographedweek one
Service brief sent to the providerautomatic
Repair-or-replace recommendationlive
Reporting to tenants and ownershipbuilt in

What you get, from the first week.