Sports & ball fields

The light on the field, measured.

Footcandles on the infield and the outfield, against the published class you actually play at. Nothing is recommended until the survey is complete, so what you take to the board is defensible line by line.

What we look for

What OnSiite expects to find here.

Every property type is configured differently, because they are different. This is the list for yours.

Field lighting, floods and poles, with head counts and mounting heightson record
Panels, transformers and meterson record
Published light-level classes, from recreational through professionalon record

What it costs you today

Where the money actually goes.

Boards do not approve field lighting on energy savings. They approve it on maintenance elimination, pole safety, light quality and the hours the field can be used. Energy is the last bullet, not the first.

A recommendation built on a half-finished survey is worse than no recommendation. The output stays locked until every pole, head, wattage and height is on file.

The question you will ask

“The last quote we saw was a number with nothing under it.”

Every scenario shows connected load, cost, the light it produces on the infield and the outfield, and the class that clears. You can compare options side by side and see exactly which assumption changed the answer.

The first weeks

What you are holding by the end of it.

One

The inventory

Field lighting, floods and poles, with head counts and mounting heights — each one located, photographed and typed, in an export that stays yours.

Two

The numbers

What each asset costs you to run, what a replacement costs, and which ones pay for themselves first — priced against live incentive programmes, not from memory.

Three

The order to do it in

A ranked list you can take to whoever signs, with the evidence attached to every line so it survives a question you are not in the room for.

What is behind the numbers

Not a calculator. A run history.

Priced options

429,676

Across 3,442 completed design runs.

Labour samples

13,813

Cost learned from finished jobs, not a price book.

Photometric files

7,154

The light on the ground is modelled, not asserted.

Incentive programmes

357

Applied to your assets, not remembered.

Next step

Walk one property with us.

Pick a building. We map every asset on it, model what each outage actually costs you in light, safety, and money, and hand you the loop: surface, understand, decide, deploy, prove.

Every asset mapped and photographedweek one
Service brief sent to the providerautomatic
Repair-or-replace recommendationlive
Reporting to tenants and ownershipbuilt in

What you get, from the first week.